Incheon LNG Combined Cycle Power Plant (Unit #1)
- 구분
화력/원자력/신재생에너지
- 발주처
Korea Midland Power Corp.
- 공사기간
2003.01~2005.06
- 국가/위치
Incheon, Korea
- 공사개요
- Total Capacity : 450MW
- Gas Turbine Generator (150MW X2)
- HRSG (Triple Pressure, Non-firing, Indoor Type X2)
- Steam Turbine Generator (Tandem Compound, 150MW x1)