Bugok LNG Combined Cycle Power Plant (Unit #2)
- 구분
화력/원자력/신재생에너지
- 발주처
GS EPS
- 공사기간
2005.11~2008.03
- 국가/위치
Bugok, Korea
- 공사개요
- Total Capacity : 550MW
- Gas Turbine Generator (180MW X2)
- HRSG (3 Pressure,Non-firing, Indoor Type X2)
- Steam Turbine Generator ( 190MW x1)